Izveidot kontuCreate account
‹ Visas procedūras
Ievadīt jaunu darbinieku — konti, atslēgas, pirmā nedēļa

people.onboard-employee·versija 1.0.0·melnraksts3 jāpārbauda

Ievadīt jaunu darbinieku — konti, atslēgas, pirmā nedēļa

Jaunais darbinieks ir pieteikts VID, pirmajā dienā ir darba konti un aprīkojums, un ir izveidots pirmās nedēļas plāns.

SanitaPersonāla vadītājsvadaProfils ›
Kadpēc notikuma — the employment contract is signed (people.employment-contract-lv finished)
Kas rīkojasaģents rīkojas pēc apstiprinājuma
Laiks60 min active; VID declaration same day if filed before the deadline
ValstsLatvija
Pieraksties, lai izpildītuŠī procedūra atveras Brain Club iekšpusē. Pieraksties, lai to lasītu un izpildītu.

Kad izmantot

A contract has been signed and the person starts within days. Not for writing the contract itself — use people.employment-contract-lv. Not for contractors — use people.hire-contractor, which has no VID employee declaration. The mirror of this playbook is people.offboard-employee: everything granted here must be revocable there.

Pirms sāc

  • The contract is signed and stored (documents module); the start date is fixed.
  • The manager has named the systems the role needs — not a default "everything" list.
  • The company's VID electronic-declaration access works (EDS / declare dashboard, ⚠ jāpārbauda current

Ko izpilde pieprasa2

  • Apstiprinājums · S2 · īpašnieksizpilde apstājas, līdz nosaukts cilvēks ieraksta lēmumu
  • Apstiprinājums · S3 · īpašnieksizpilde apstājas, līdz nosaukts cilvēks ieraksta lēmumu

Jebkurš solis var gaidīt līdz datumam un atveras pats; katrs noslēgts solis atstāj pierādījumu (piezīmi, saiti, skaitli).

Ceļš9 soļi

  1. Open the onboarding recordaģents

    Create the record: name, personal code, bank account, start date, role, manager, equipment needed, systems needed.

    Izdarīts, kad the record exists and every field is filled from the contract, not from memory.

    ⛔ A personal code copied by hand is the classic error — read it back from the signed contract.

  2. Approve the access set and equipmentīpašnieksvajag apstiprinājumu · īpašnieks

    Apstiprinājums · S2 · īpašnieks — izpilde apstājas, līdz nosaukts cilvēks ieraksta lēmumu

    Show the systems list, the equipment list and the cost.

    Izdarīts, kad the owner has approved both lists as they stand, or named the changes.

  3. File the VID declaration (Latvia)aģentsvajag apstiprinājumu · īpašnieks

    Apstiprinājums · S3 · īpašnieks — izpilde apstājas, līdz nosaukts cilvēks ieraksta lēmumu

    Submit the employee's data to VID through the employer's electronic declaration before the first working day (⚠ jāpārbauda exact deadline and form on vid.gov.lv).

    Izdarīts, kad VID shows the declaration as accepted for this employee and start date.

    ⛔ Filing with a wrong personal code is worse than filing late — check it against the contract first.

  4. Create the mailboxaģents

    Create the mailbox in the mail module under the company domain, following tech.create-mailbox; set a first password from the paroles rules and prepare the handoff.

    Izdarīts, kad a test message sent to the address arrives in the new mailbox.

  5. Grant access to the approved systemsaģents

    Create the account in each system approved in S2, record the credential per the paroles module rules (individual passwords, no sharing), and note each grant in the onboarding record.

    Izdarīts, kad every approved system lists the new account and no system outside the list does.

  6. Prepare equipment and workplaceaģents

    Laptop imaged and enrolled, keys or badge issued, desk ready. Record serials in inventory.

    Izdarīts, kad the inventory row exists with serial numbers and the issued date.

  7. First dayīpašnieks

    The manager welcomes the employee, hands over the contract copy, and runs the safety briefing per people.workplace-safety-lv.

    Izdarīts, kad the employee has signed the safety-briefing acknowledgement and it is stored in the documents module.

  8. Build the first weekaģents

    Create the first-week tasks in the tasks module: system training, introductions, first deliverable, and a probation checkpoint linked to people.probation-review.

    Izdarīts, kad every task has an owner and a due date inside the first week.

  9. Verify and hand backaģents

    Read back the onboarding record: VID accepted, mailbox live, accounts match the approved list, inventory row, briefing signed, week planned. Send the manager a three-line summary.

    Izdarīts, kad every item in the record shows an observable fact, not a plan.

Pārbaudes — kā zinām, ka izdevās

  • VID shows the declaration as accepted for this personal code and start date (read it back from VID, not
  • The mailbox receives mail and the employee can log in on day one.
  • The account list equals the list approved in S2 — nothing more.
  • Inventory shows the equipment with serials against this employee.
  • The safety-briefing acknowledgement is signed and stored.
  • Payroll has the employee with the correct bank account (the next money.payroll-run will use it).

Ja noiet greizi

PazīmeRīcība
VID rejects the declarationCheck the personal code and legal address against the signed contract; fix and resubmit the same day; never let the start date pass unfiled.
Mailbox name already takenUse the company's naming rule (e.g. first name + initial), confirm the choice with the manager, update the record.
Equipment not ready for day oneDo not delay the start; issue a temporary device, record it as temporary in inventory, set a task to swap it within the week.
Employee starts before the declaration is filedFile immediately on discovery; check the first payroll run against the declaration; record the miss in the run evidence.
A grant was made outside the approved listRevoke it the same day, note it in the record, and check S2's list was the cause.

Ko atstāj katrs solis

  1. S1the record exists and every field is filled from the contract, not from memory.
  2. S2the owner has approved both lists as they stand, or named the changes.
  3. S3VID shows the declaration as accepted for this employee and start date.
  4. S4a test message sent to the address arrives in the new mailbox.
  5. S5every approved system lists the new account and no system outside the list does.
  6. S6the inventory row exists with serial numbers and the issued date.
  7. S7the employee has signed the safety-briefing acknowledgement and it is stored in the documents module.
  8. S8every task has an owner and a due date inside the first week.
  9. S9every item in the record shows an observable fact, not a plan.

Ko saglabāt

VID declaration id and acceptance timestamp · the onboarding record with the approved lists · inventory serials and issue date · signed safety-briefing acknowledgement · the account list as granted · the manager's S9 summary.

Kā šī procedūra uzlabojas

After every 5 onboarding runs ask: how many days from contract signed to fully onboarded, and which step waited? Did any check in S9 catch an error, or did payroll or the employee find it later? Did anyone get access that people.offboard-employee later had to chase? A new version changes the step that caused the wait or the miss, and says so in its change note.

Nosaukums un kopsavilkums ir latviski. Detalizētā izpildes kārtība pagaidām ir kanoniskajā angļu valodas versijā; juridiskos un finanšu soļus publicēsim latviski tikai pēc cilvēka pārbaudes.